PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Emergency night lighting at the 2nd floor Facing West.jpg Installing gravel at Electrical Room Facing North.jpg Setting up the Attorneys door frames Facing South-East.jpg Started laying out block at Bathrooms 133-136 Facing Norh.jpg Installed copper piping at the 4th floor bathroom Facing West.jpg Installing duct work raisers at the 4th floor Facing North.jpg Laying out gravel at Electrical room slab Facing West.jpg Aligning stone panels at the North Elevation.jpg
Previous pageNext page Installed copper piping at the 4th floor bathroom Facing West
Installed copper piping at the 4th floor bathroom Facing West